Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Heavy excavation furnished material for rock-fill dam
Construction of San Gabriel Dam No. 1, 1670 ft in length, rising 300 ft above stream bed.
Heavy excavation furnished material for rock-fill dam
Construction of San Gabriel Dam No. 1, 1670 ft in length, rising 300 ft above stream bed.
Heavy excavation furnished material for rock-fill dam
Contractors Engrs Monthly
Coyle, J.C. (Autor:in)
1934
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Excavation and fill ordnance protects public
Engineering Index Backfile | 1954
|Solving quantities in excavation and fill
Engineering Index Backfile | 1942
|Heavy rock excavation and cyclopean concrete retaining walls
Engineering Index Backfile | 1939
|Engineering Index Backfile | 1949
|Engineering Index Backfile | 1888