Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Data on 1-yr's operation of refrigerating system circulating water, at temperature of 40 F, through concrete of Boulder Dam to extract heat of hydration and cool mass to permit immediate grouting of construction joints; cross-section of dam showing isotherms and result of cooling; temperature curves typical of heating and cooling of normal, blended and low-heat cement.
Data on 1-yr's operation of refrigerating system circulating water, at temperature of 40 F, through concrete of Boulder Dam to extract heat of hydration and cool mass to permit immediate grouting of construction joints; cross-section of dam showing isotherms and result of cooling; temperature curves typical of heating and cooling of normal, blended and low-heat cement.
Cooling Boulder dam concrete
Eng News-Rec
Steele, B.W. (Autor:in)
Engineering News-Record ; 113
1934
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Boulder dam cement and concrete studies
Engineering Index Backfile | 1934
|Cableways place concrete in Boulder Dam
Engineering Index Backfile | 1934
Testing reinforced concrete pipe at Boulder
Engineering Index Backfile | 1917
|Boulder dam engineers solve cooling, ventilating problems
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1937
|