Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Tata Power Company's hydro-electric project
Construction and costs of 100,000 kw. project, including curved masonry dam about 160 ft. high, side discharge spillway of 60,000-sec. ft. capacity, tunnel, penstocks, power house, 110,000-volt transmission line to Bombay, etc. (see also Instn. Civil Engrs. -- Proc., no. 4707, 1929, 37 pp., 2 supp. plates; and Engineering, vol. 127, no. 3301, Apr. 19, 1929, pp. 487-488)
The Tata Power Company's hydro-electric project
Construction and costs of 100,000 kw. project, including curved masonry dam about 160 ft. high, side discharge spillway of 60,000-sec. ft. capacity, tunnel, penstocks, power house, 110,000-volt transmission line to Bombay, etc. (see also Instn. Civil Engrs. -- Proc., no. 4707, 1929, 37 pp., 2 supp. plates; and Engineering, vol. 127, no. 3301, Apr. 19, 1929, pp. 487-488)
The Tata Power Company's hydro-electric project
Water Water Eng
Cursetjee, N.J.M. (Autor:in)
1929
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Tata Power Company's Hydro-Electric Project
Engineering Index Backfile | 1930
|The Tata Power Company's hydro-electric project
Engineering Index Backfile | 1929
|The Tata Power Company's hydro-electric project
Engineering Index Backfile | 1929
|The Tata hydro-electro power-plant Bombay -- II
Engineering Index Backfile | 1919
Engineering Index Backfile | 1905
|