Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction operations on Sacatella Storm Drain, no. 3, Los Angeles; excavation handled with 1 1/2 yd. Kohring dragline; concrete for boxed sections was mixed by pavers handling 6-bag batches of 1:2:3 1/2 concrete and depositing it by steel chute direct to forms.
Construction operations on Sacatella Storm Drain, no. 3, Los Angeles; excavation handled with 1 1/2 yd. Kohring dragline; concrete for boxed sections was mixed by pavers handling 6-bag batches of 1:2:3 1/2 concrete and depositing it by steel chute direct to forms.
Paver pours box section of storm drain
Contractors Engrs. Monthly
Curry, C.D. (Autor:in)
1929
3 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1992
|Taylor & Francis Verlag | 1974