Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Bureau of Reclamation; combined earth and concrete gravity; dam 80 ft. high and 1 mi. long; concrete portion of dam is surmounted by concrete highway bridge; right-of-way problems; geology of dam and reservoir sites; design methods; contraction joints; radial-gate hoisting mechanism; grouting and draining foundation; uplift pressure measurements; core-walls; total cost of dam $2,592,214; bridge $148,370. (See also West. Construction News, vol. 4, no. 18, Sept. 25, 1929, pp. 480-490, 8 figs.; also New Reclamation Era, vol. 20, no. 2, Feb. 1929, pp. 2629, 2 figs.)
Construction of Bureau of Reclamation; combined earth and concrete gravity; dam 80 ft. high and 1 mi. long; concrete portion of dam is surmounted by concrete highway bridge; right-of-way problems; geology of dam and reservoir sites; design methods; contraction joints; radial-gate hoisting mechanism; grouting and draining foundation; uplift pressure measurements; core-walls; total cost of dam $2,592,214; bridge $148,370. (See also West. Construction News, vol. 4, no. 18, Sept. 25, 1929, pp. 480-490, 8 figs.; also New Reclamation Era, vol. 20, no. 2, Feb. 1929, pp. 2629, 2 figs.)
American falls dam, minidoka project, Idaho
Eng. Contracting
Houk, I.E. (Autor:in)
1929
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
American falls dam, minidoka project, Idaho
Engineering Index Backfile | 1929
|American falls dam, Minidoka project, Idaho
Engineering Index Backfile | 1929
|Federal project at Minidoka, Idaho
Engineering Index Backfile | 1915
|Gravity extension division, Minidoka project, Idaho
Engineering Index Backfile | 1930
|Drainage of irrigated lands on the Minidoka Project, Idaho
Engineering Index Backfile | 1912
|