Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction progress on dam for owyhee irrigation project
Foundation for 522-ft. structure to be unwatered in summer of 1929, diversion tunnel drive; concrete handled in 8-yard buckets.
Construction progress on dam for owyhee irrigation project
Foundation for 522-ft. structure to be unwatered in summer of 1929, diversion tunnel drive; concrete handled in 8-yard buckets.
Construction progress on dam for owyhee irrigation project
Eng. News-Rec
Engineering News Record ; 103
1929
2 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Owyhee irrigation project, Oregon-Idaho
Engineering Index Backfile | 1931
|Owyhee irrigation project tunnels
Engineering Index Backfile | 1931
|Design of the Owyhee irrigation dam
Engineering Index Backfile | 1928
|Design of the Owyhee irrigation dam
Engineering Index Backfile | 1928
|Design of the Owyhee irrigation dam
Engineering Index Backfile | 1928
|