Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stony gorge dam built over fault subject to settlement
Ambursen type dam, 142 ft. high, 868 ft. long, selected as being best able to resist destruction in case of uneven settlement, erected to provide supplementary water supply for Orland irrigation project Calif.; 0.65 was assumed for sliding factor; three bays of overflow section, in central portion of dam, provide spillway capacity for 30, 000-sec. ft.; methods of construction and detailed cost analysis.
Stony gorge dam built over fault subject to settlement
Ambursen type dam, 142 ft. high, 868 ft. long, selected as being best able to resist destruction in case of uneven settlement, erected to provide supplementary water supply for Orland irrigation project Calif.; 0.65 was assumed for sliding factor; three bays of overflow section, in central portion of dam, provide spillway capacity for 30, 000-sec. ft.; methods of construction and detailed cost analysis.
Stony gorge dam built over fault subject to settlement
Eng. News-Rec
Savage, J.L. (Autor:in) / Gault, H.J. (Autor:in)
Engineering News Record ; 103
1929
7 pages
10 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1928
Safety. Safety measures for Stony Gorge dam
Engineering Index Backfile | 1928
Making concrete at Stony Gorge storage dam
Engineering Index Backfile | 1929
|Stony Gorge Dam - Structural Analysis of Modification Alternative
British Library Conference Proceedings | 2006
|