Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Detailing concrete form work
Apr 13 1929 n 15 p 20-22: Application of detail plan to actual working conditions with use of form tickets. Apr 20 1929 n 16 p 15: Estimating and scheduling labor and material needs and deliveries; designing for early wrecking. Apr 27 1929 n 17 pp. 22: Economy in form handling by avoiding waste, pilferage, waiting on trucks and mixed lumber piles. May 4 1929 n 18 p 21-22, 4 figs: Uncovering discrepancies in architects' plans and correcting them before work starts.
Detailing concrete form work
Apr 13 1929 n 15 p 20-22: Application of detail plan to actual working conditions with use of form tickets. Apr 20 1929 n 16 p 15: Estimating and scheduling labor and material needs and deliveries; designing for early wrecking. Apr 27 1929 n 17 pp. 22: Economy in form handling by avoiding waste, pilferage, waiting on trucks and mixed lumber piles. May 4 1929 n 18 p 21-22, 4 figs: Uncovering discrepancies in architects' plans and correcting them before work starts.
Detailing concrete form work
Am. Contractor
Ellsworth, C.W. (Autor:in) / Keller, H.S. (Autor:in)
1929
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Detailing Corner - Detailing Concrete Columns
Online Contents | 2011
TIBKAT | 1967
|TIBKAT | 1981
|Reinforced Concrete Detailing Practice
British Library Conference Proceedings | 2001
|Detailing Concrete Segmental Paving
British Library Conference Proceedings | 1992
|