Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Notes on preliminary study and final planning of project; irrigation zones and water allotment; technical data on construction progress; influence of transportation on cost; hydroelectric plant to drive air compressors for tunnel; total of $19,792,000 expended for three construction contracts; derivation canals will cost $5,500,000 Chilean currency.
Notes on preliminary study and final planning of project; irrigation zones and water allotment; technical data on construction progress; influence of transportation on cost; hydroelectric plant to drive air compressors for tunnel; total of $19,792,000 expended for three construction contracts; derivation canals will cost $5,500,000 Chilean currency.
Melado canal -- 1926 report
Canal del Melado -- Memoria del anyo 1926
Delpiano, C. (Autor:in)
1929
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
History and Engineering of the Suez Canal: 1926 BC to 1869 AD
British Library Conference Proceedings | 2004
|Engineering Index Backfile | 1885
Report of the Secretary for the Year 1926
Wiley | 1928
Report of the Finance Committee, 1926 and 1927
Wiley | 1928
|