Data and comments on several steel-arch and steel-truss designs out of a total of 388 submitted for construction of combined bridges between Mannheim and Ludwigshafen having overall length of about 300 m.; between Speyer and Lusshof, having overall length of about 538 m., and between Maxau and Maximiliansau, having overall length of 300 m. (See also - no 28 July 12 1929 pp 489-498, no 29 July 19 pp 511-514, no 30 July 26 pp 525-529, no 31 Aug 2 pp 543-550, no 32 Aug 9 pp 563-567)
Results of Preliminary Competition Design for Three Bridges over Rhine, between Mannheim and Ludwigshafen and at Speyer and Maxau
Data and comments on several steel-arch and steel-truss designs out of a total of 388 submitted for construction of combined bridges between Mannheim and Ludwigshafen having overall length of about 300 m.; between Speyer and Lusshof, having overall length of about 538 m., and between Maxau and Maximiliansau, having overall length of 300 m. (See also - no 28 July 12 1929 pp 489-498, no 29 July 19 pp 511-514, no 30 July 26 pp 525-529, no 31 Aug 2 pp 543-550, no 32 Aug 9 pp 563-567)
Results of Preliminary Competition Design for Three Bridges over Rhine, between Mannheim and Ludwigshafen and at Speyer and Maxau
Ergebnis des Ideenwettbewerbes fuer die drei Rheinbruecken bei Mannheim-Ludwigshafen, Speyer and Maxau
Weyher, R. (Autor:in)
Bauingenieur ; 10
1929
9 pages
113 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rhine bridge between Ludwigshafen and Mannheim
Engineering Index Backfile | 1930
|Competitive preliminary design of bridge over the rhine between Ludwigshafen and Mannheim
Engineering Index Backfile | 1929
|Vehicular bridge over Rhine (river) between Mannheim and Ludwigshafen
Engineering Index Backfile | 1960
|Engineering Index Backfile | 1929
|