Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Winter construction of concrete bridge, Springfield, mo
Quick-setting cement is principal factor in rapid work; ground limestone used as fine aggregate for bridge, consisting of 12 spans 33-1/3 ft. long and of four lines of beams carrying roadway slab, 18 ft. wide.
Winter construction of concrete bridge, Springfield, mo
Quick-setting cement is principal factor in rapid work; ground limestone used as fine aggregate for bridge, consisting of 12 spans 33-1/3 ft. long and of four lines of beams carrying roadway slab, 18 ft. wide.
Winter construction of concrete bridge, Springfield, mo
Eng. News-Rec
Gray, W.J. (Autor:in)
Engineering News Record ; 102
1929
2 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Springfield -- West Springfield bridge
Engineering Index Backfile | 1922
Engineering Index Backfile | 1929
|Concrete paving in Springfield, mass
Engineering Index Backfile | 1917
Constructing arch ribs of Springfield bridge
Engineering Index Backfile | 1922
Erecting the Springfield bridge on semi-suspended falsework
Engineering Index Backfile | 1908