Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sewer tunneling in fine sand in Brooklyn
Illustrated description of the heavy timbering required for a 3 1-2 ft. brick sewer in running sand. (1900 w.)
Sewer tunneling in fine sand in Brooklyn
Illustrated description of the heavy timbering required for a 3 1-2 ft. brick sewer in running sand. (1900 w.)
Sewer tunneling in fine sand in Brooklyn
Eng Rec
1901
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1906
|Sewer construction in Brooklyn
Engineering Index Backfile | 1905
Sewer construction in Brooklyn
Engineering Index Backfile | 1905
Engineering Index Backfile | 1920
Sewer construction in Brooklyn
Engineering Index Backfile | 1916