Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The sewage disposal works at Saratoga, N. Y.
Explains the conditions to be met, and gives an illustrated detailed description of the plant and its construction. It includes a new main sewer, the building of a small pump well and pumping station, the lifting of the sewage 15 feet by centrifugal pumps, the laying of a 9,000 foot force main, the building of a septic tank of 1,000, 000 gals. capacity, and the construction of 18 acres of sand filters. (9500 w.)
The sewage disposal works at Saratoga, N. Y.
Explains the conditions to be met, and gives an illustrated detailed description of the plant and its construction. It includes a new main sewer, the building of a small pump well and pumping station, the lifting of the sewage 15 feet by centrifugal pumps, the laying of a 9,000 foot force main, the building of a septic tank of 1,000, 000 gals. capacity, and the construction of 18 acres of sand filters. (9500 w.)
The sewage disposal works at Saratoga, N. Y.
Jour Assn Engng Socs
Barbour, F.A. (Autor:in)
1905
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1894
|Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|Sheffield sewage disposal works
Engineering Index Backfile | 1914
|Birmingham sewage disposal works
Engineering Index Backfile | 1911
|