Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of a tunnel for foot passengers
Construction of a tunnel for foot passengers through a ridge in the most populous part of Stockholm, Sweden. Lightfoot's dry air refrigerator process employed.
Construction of a tunnel for foot passengers
Construction of a tunnel for foot passengers through a ridge in the most populous part of Stockholm, Sweden. Lightfoot's dry air refrigerator process employed.
Construction of a tunnel for foot passengers
Sci Am Sup
1886
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Tunnel for foot passengers at Stockholm
Engineering Index Backfile | 1886
Tunnel for foot passengers at Stockholm
Engineering Index Backfile | 1886
TUNNEL ELEPHANT FOOT REINFORCEMENT BEAM CONSTRUCTION METHOD FOR TUNNEL STABILIZING
Europäisches Patentamt | 2016
|Tunnel elephant foot reinforcement beam construction method for tunnel stabilizing
Europäisches Patentamt | 2016
Tunnel gradients and aural health criterion for train passengers
Tema Archiv | 2014
|