Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reconstruction of soaking pit building
Problems encountered and their solutions during construction of heavy welded steel framed mill building in highly congested area at Stocksbridge steel works of Samuel Fox and Co; erection carried out above old soaking pit building and through existing mill roofs without interference with continuous steel production below; factors influencing final unusual design which makes use of heavy portal frames and Vierendeel girders. (See also - discussion v 32 n 5 May 1954 p 153-6)
Reconstruction of soaking pit building
Problems encountered and their solutions during construction of heavy welded steel framed mill building in highly congested area at Stocksbridge steel works of Samuel Fox and Co; erection carried out above old soaking pit building and through existing mill roofs without interference with continuous steel production below; factors influencing final unusual design which makes use of heavy portal frames and Vierendeel girders. (See also - discussion v 32 n 5 May 1954 p 153-6)
Reconstruction of soaking pit building
Structural Engr
Husband, H.C. (Autor:in) / Best, K.H. (Autor:in)
Structural Engineer ; 31
1953
15 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Ceramic tile soaking device for building construction
Europäisches Patentamt | 2021
|Soaking device for building tiles and implementation method
Europäisches Patentamt | 2022
|