Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Colorado's first cement stabilized base project
Colorado Dept Highways' standard method for flexible base design utilizes CBR values to establish thickness of stabilization materials; materials available for stabilization consist of blow sand, sand and gravel, and subgrade soils treated with cement; compaction achieved with sheeps foot roller, and rubber tired roller; tests to find most efficient mixtures of soil cement.
Colorado's first cement stabilized base project
Colorado Dept Highways' standard method for flexible base design utilizes CBR values to establish thickness of stabilization materials; materials available for stabilization consist of blow sand, sand and gravel, and subgrade soils treated with cement; compaction achieved with sheeps foot roller, and rubber tired roller; tests to find most efficient mixtures of soil cement.
Colorado's first cement stabilized base project
Western Construction
Reseigh, T.C. (Autor:in)
Western Construction ; 28
1953
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Colorado's Prairie Waters Project Dedicated
Wiley | 2010
Engineering Index Backfile | 1951
Engineering Index Backfile | 1946