Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Subsoil stabilization saves 40-year-old reservoir
Concrete reservoir, nearly 40 yr old, at Easton, Pa, designed for 1, 000,000 gal, had capacity of only 70% due to seepage through sidewall cracks; 196 holes, 2 in. in diam, drilled through walls served as means of filling void spaces and injecting solidifying chemicals; final step of rehabilitation was "shot-creting" 3 in. concrete covering.
Subsoil stabilization saves 40-year-old reservoir
Concrete reservoir, nearly 40 yr old, at Easton, Pa, designed for 1, 000,000 gal, had capacity of only 70% due to seepage through sidewall cracks; 196 holes, 2 in. in diam, drilled through walls served as means of filling void spaces and injecting solidifying chemicals; final step of rehabilitation was "shot-creting" 3 in. concrete covering.
Subsoil stabilization saves 40-year-old reservoir
Am City
Johnson, W.B. (Autor:in) / Fulmer, Jr., J.O. (Autor:in)
American City ; 69
1954
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reservoir construction costs lowered by underdraining subsoil
Engineering Index Backfile | 1949
Deep stabilization of sandfill in organic subsoil
British Library Conference Proceedings | 1999
|Geogrids subgrade stabilization saves time and expense
Tema Archiv | 2002
|Wiley | 2012
|Wiley | 2015