Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Welded erection seat eliminates field bolts in welded steel frame
Special erection seat, shop-welded to columns and beams, eliminated; use of field bolts during erection of arc-welded frame of 18-story steel-and-concrete Allied Arts Building, Lynchburg, Va.; beams are supported in erection seat by angles of split I-beam stubs where rigidity and extra shear resistance were required; channels were used as reinforcement lengthwise.
Welded erection seat eliminates field bolts in welded steel frame
Special erection seat, shop-welded to columns and beams, eliminated; use of field bolts during erection of arc-welded frame of 18-story steel-and-concrete Allied Arts Building, Lynchburg, Va.; beams are supported in erection seat by angles of split I-beam stubs where rigidity and extra shear resistance were required; channels were used as reinforcement lengthwise.
Welded erection seat eliminates field bolts in welded steel frame
Eng. News Rec
Ellis, A.R. (Autor:in)
Engineering News-Record ; 107
1931
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
All-welded machine shop frame designed for rapid erection
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1952
Current practices in welded piping erection
Engineering Index Backfile | 1949
|Engineering Index Backfile | 1967
|A field-welded steel frame office building
Engineering Index Backfile | 1929
|