Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete-lined spillway channel, 100 ft. wide, to carry 150,000 sec. ft. for Narrows Dam, Yadkin River, designed and built after experimental studies; experiments on models solve problems; no hydraulic problem involving unprecedented conditions in flow of water at high velocities should be considered properly solved until proposed designs have been checked, and possibly revised by experiments on operating methods.
Concrete-lined spillway channel, 100 ft. wide, to carry 150,000 sec. ft. for Narrows Dam, Yadkin River, designed and built after experimental studies; experiments on models solve problems; no hydraulic problem involving unprecedented conditions in flow of water at high velocities should be considered properly solved until proposed designs have been checked, and possibly revised by experiments on operating methods.
Reconstruction of large spillway
Civil Eng. (N. Y.)
Ewald, R.F. (Autor:in)
1931
6 pages
14 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
THIRTY YEARS OF SPILLWAY RECONSTRUCTION: IMPACTS OF MOVING TO A RISK BASED SPILLWAY STANDARD
British Library Conference Proceedings | 2016
|Savings in the reconstruction of a spillway
British Library Conference Proceedings | 2006
|Spillway Modifications. San Esteban Spillway
British Library Conference Proceedings | 1992
|Spillway Gate Forces-Montgomery Point Spillway
British Library Conference Proceedings | 1995
|Reconstruction at the Sayano-Shushenskaya HPS: shore spillway
British Library Conference Proceedings | 2009
|