Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Details of 17-5-mile paving project in Iowa
Average of 110 ft. per hr. pouring 18 ft. slab was maintained on job near Carroll; artificial pond created for booster pump; grade well-prepared ahead of forms.
Details of 17-5-mile paving project in Iowa
Average of 110 ft. per hr. pouring 18 ft. slab was maintained on job near Carroll; artificial pond created for booster pump; grade well-prepared ahead of forms.
Details of 17-5-mile paving project in Iowa
Contractors Engrs. Monthly
1931
5 pages
12 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Iowa paving project "speeds" to completion
British Library Online Contents | 1993
Twelve mile paving project involving Viaduct and bridge
Engineering Index Backfile | 1928
Twelve mile paving project involving viaduct and bridge
Engineering Index Backfile | 1928
Brick resurfaced with concrete on Iowa paving project
Engineering Index Backfile | 1933
Engineering Index Backfile | 1903