Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cement pressure-grouting stops settlement of ramp piers in fill
Methods of consolidation by grouting of settling foundations of reinforced-concrete structure supported on nine pairs of piers, 50 ft. center to center, with abutment 54 ft. long at lower end; Francois cementation process.
Cement pressure-grouting stops settlement of ramp piers in fill
Methods of consolidation by grouting of settling foundations of reinforced-concrete structure supported on nine pairs of piers, 50 ft. center to center, with abutment 54 ft. long at lower end; Francois cementation process.
Cement pressure-grouting stops settlement of ramp piers in fill
Eng. News-Rec
Taylor, M. (Autor:in)
Engineering News-Record ; 107
1931
2 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Compaction Grouting Stops Settlement of an Operating Water Treatment Plant
British Library Conference Proceedings | 1994
|Settlement treatment grouting device for high fill construction foundation
Europäisches Patentamt | 2024
|Internal grouting restores stone masonry piers
Engineering Index Backfile | 1934
DRILLED PIERS WITH BASE PRELOADING BY GROUTING
British Library Conference Proceedings | 1995
|