Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building flood control levee with power drag scraper
Construction of section of levee along Los Angeles River, Calif.; operation of 1-yd. Northwest dragline with 40-ft. boom and 1 1/2-yd. Sauerman Cresent drag scraper; handling earth over max. span of 175 ft. from borrow pit to levee.
Building flood control levee with power drag scraper
Construction of section of levee along Los Angeles River, Calif.; operation of 1-yd. Northwest dragline with 40-ft. boom and 1 1/2-yd. Sauerman Cresent drag scraper; handling earth over max. span of 175 ft. from borrow pit to levee.
Building flood control levee with power drag scraper
Contractors Engrs. Monthly
Smith, T.G. (Autor:in)
1931
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1943
RISK OF FLOOD LEVEE OVERFLOWING
British Library Conference Proceedings | 2000
|Engineered Levee Breaches for Flood Mitigation
British Library Online Contents | 2001
|Engineering Index Backfile | 1916
|