Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Features of new British Columbia Power Corp. development on Stave River, with ultimate capacity of 188,000 hp., including 195-ft. concrete dam, intake and penstock tunnels, power house building, and two transmission circuits to Vancouver; concrete for dam, excavation, foundation grouting and drainage; design of seven Taintor gates each having width of 33 ft. and height of 26 ft.; electric equipment; power-house arrangement.
Features of new British Columbia Power Corp. development on Stave River, with ultimate capacity of 188,000 hp., including 195-ft. concrete dam, intake and penstock tunnels, power house building, and two transmission circuits to Vancouver; concrete for dam, excavation, foundation grouting and drainage; design of seven Taintor gates each having width of 33 ft. and height of 26 ft.; electric equipment; power-house arrangement.
Construction of Ruskin power project
Can. Engr
Blee, C.E. (Autor:in)
Canadian Engineer ; 60
1931
6 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|British Library Online Contents | 1997
|Engineering Index Backfile | 1930
Online Contents | 1997
|Ruskin Today: Building the Ruskin Library, Lancaster
British Library Conference Proceedings | 2003
|