Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Drainage works for new Madrid floodway
New Madrid, Mo., floodway drainage works in Mississippi River basin; construction of back levee across natural drainage courses necessitate ditch system, culverts and bridges costing half million dollars; structures, construction method and cost averages; Brewers Lake basin drainage; main drainage-ditch construction; levee crossings; bridge location; structures are standardized.
Drainage works for new Madrid floodway
New Madrid, Mo., floodway drainage works in Mississippi River basin; construction of back levee across natural drainage courses necessitate ditch system, culverts and bridges costing half million dollars; structures, construction method and cost averages; Brewers Lake basin drainage; main drainage-ditch construction; levee crossings; bridge location; structures are standardized.
Drainage works for new Madrid floodway
Eng. News-Rec
Knappen, T.T. (Autor:in)
Engineering News-Record ; 106
1931
5 pages
9 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Constructing 35-mile new Madrid floodway levee
Engineering Index Backfile | 1931
|Construction methods and equipment on new Madrid floodway
Engineering Index Backfile | 1931
Engineering Index Backfile | 1944
Engineering Index Backfile | 1961
|Engineering Index Backfile | 1956
|