Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Easton dam, Yakima project, Washington
Gravity-type concrete structure, 248 ft. long and 66 ft. max. height; spillway section is 64 ft. long and is provided with 64 ft. by 14 1/2 ft. structural-steel floating-drum gate; care of river during construction; foundation excavation and grouting; concreting; erecting drum gate and wall plates.
Easton dam, Yakima project, Washington
Gravity-type concrete structure, 248 ft. long and 66 ft. max. height; spillway section is 64 ft. long and is provided with 64 ft. by 14 1/2 ft. structural-steel floating-drum gate; care of river during construction; foundation excavation and grouting; concreting; erecting drum gate and wall plates.
Easton dam, Yakima project, Washington
New Reclamation Era
Imrie, G.C. (Autor:in) / Whitmore, A.A. (Autor:in)
New Reclamation Era ; 22
1931
3 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Cle Elum dam, Yakima project, Washington
Engineering Index Backfile | 1931
Reconstruction of portion of Mabton pressure pipe, Sunnyside division, Yakima project, Washington
Engineering Index Backfile | 1931
|Construction of main canal lining in kittitas division, Yakima reclamation project, Washington
Engineering Index Backfile | 1930
|Concrete lining on Yakima project
Engineering Index Backfile | 1945
|