Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Treatment of foundations of woronora dam for Sydney water supply
Lines and initial stages of construction of curved gravity dam, 222 ft. high, built of sandstone cyclopean concrete; geological report on site; preliminary stripping; test of sand seams; cut-off trench; driving test pipes; grouting of tunnels.
Treatment of foundations of woronora dam for Sydney water supply
Lines and initial stages of construction of curved gravity dam, 222 ft. high, built of sandstone cyclopean concrete; geological report on site; preliminary stripping; test of sand seams; cut-off trench; driving test pipes; grouting of tunnels.
Treatment of foundations of woronora dam for Sydney water supply
Commonwealth Engr
Chalmers, A. (Autor:in)
1931
10 pages
14 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2002
|Engineering Index Backfile | 1932
|Nepean dam, Sydney water supply
Engineering Index Backfile | 1934
Improving water supply of Sydney
Engineering Index Backfile | 1949
|Sydney harbour bridge: Design of structure and foundations
Engineering Index Backfile | 1934
|