Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Placing 350,000 cubic yards of concrete in ariel dam
Construction of concrete arch dam having max. height of 313 ft. above foundation which is as deep as 125 ft. below stream bed; final location based on 26,000 ft. of drill-hole exploration. (see also anonymous description in Eng. News-Rec., vol. 106, no. 11, Mar. 12, 1931, pp. 435-438, 3 figs.)
Placing 350,000 cubic yards of concrete in ariel dam
Construction of concrete arch dam having max. height of 313 ft. above foundation which is as deep as 125 ft. below stream bed; final location based on 26,000 ft. of drill-hole exploration. (see also anonymous description in Eng. News-Rec., vol. 106, no. 11, Mar. 12, 1931, pp. 435-438, 3 figs.)
Placing 350,000 cubic yards of concrete in ariel dam
Concrete
Scott, W.A. (Autor:in)
Concrete ; 38
1931
4 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Placing 350,000 cubic yards of concrete in ariel dam
Engineering Index Backfile | 1931
|Placing 300,000 cubic yards of concrete
Engineering Index Backfile | 1914
A 350,000-volt testing transformer
Engineering Index Backfile | 1922
|Caballo dam on Rio Grande to store 350,000 ac ft
Engineering Index Backfile | 1936
20,000 cubic yards of concrete in new government printing office
Engineering Index Backfile | 1957