Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Jack 68-in. pipe under fill
Installation of nine precast flat-bottom culvert sections broadens application of tunneling method as exemplified by concrete pipe installation under double-track embankment of Terminal Railroad Assn. of St. Louis; sections weigh 9 tons each.
Jack 68-in. pipe under fill
Installation of nine precast flat-bottom culvert sections broadens application of tunneling method as exemplified by concrete pipe installation under double-track embankment of Terminal Railroad Assn. of St. Louis; sections weigh 9 tons each.
Jack 68-in. pipe under fill
Ry. Eng. Maintenance
1931
2 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Site control of pipe jack alignments
British Library Conference Proceedings | 1998
|High Density Polyethylene Pipe Under High Fill-A Continuing Study
British Library Conference Proceedings | 1996
|