Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Coke-oven plant at beckton gas works
Plant in course of erection will have capacity of 1200 tons of coal dally.
Coke-oven plant at beckton gas works
Plant in course of erection will have capacity of 1200 tons of coal dally.
Coke-oven plant at beckton gas works
Concrete Constr. Eng.
1931
10 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2014
Docklands Light Railway Beckton Extension London
British Library Online Contents | 1998
COKE OVEN TEMPORARY SUPERSTRUCTURE AND CONSTRUCTION METHOD OF COKE OVEN
Europäisches Patentamt | 2015
|