Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cable construction on Hudson River bridge
Apr: Spinning four 36-in. cables; improvements in equipment and methods made it possible to operate spinning wheel at normal speed of 650 ft. per min.; split sheaves; unreeling machines; speed control; handling strands; compacting cables.
Cable construction on Hudson River bridge
Apr: Spinning four 36-in. cables; improvements in equipment and methods made it possible to operate spinning wheel at normal speed of 650 ft. per min.; split sheaves; unreeling machines; speed control; handling strands; compacting cables.
Cable construction on Hudson River bridge
Construction Methods
Construction Methods ; 13
1931
4 pages
17 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Cable construction on Hudson River bridge
Engineering Index Backfile | 1931
Engineering Index Backfile | 1931
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1928
|Engineering Index Backfile | 1921