Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design of cableways with carrying cable anchored at both ends
Method is developed for calculation of multispan cableway, with carrying cable subjected only to loads perpendicular to its axis, and parallel stress component carried by traction cable; solutions are obtained for particular cases of rigidly fixed intermediate towers with cable gliding on supports, and mobile intermediate towers with cable fixed to them. (See also n 18 Sept 15 1964 p 339-42, n 19 Oct 1 p 365-8)
Design of cableways with carrying cable anchored at both ends
Method is developed for calculation of multispan cableway, with carrying cable subjected only to loads perpendicular to its axis, and parallel stress component carried by traction cable; solutions are obtained for particular cases of rigidly fixed intermediate towers with cable gliding on supports, and mobile intermediate towers with cable fixed to them. (See also n 18 Sept 15 1964 p 339-42, n 19 Oct 1 p 365-8)
Design of cableways with carrying cable anchored at both ends
Calcul des telepheriques avec cable porteur a double ancrage
Zweifel, O. (Autor:in)
Genie Civil ; 141
1964
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Behavior of cables of cableways anchored rigidly at both ends
Engineering Index Backfile | 1946
|ASCE | 2021
|Engineering Index Backfile | 1928
|Engineering Index Backfile | 1922
|Engineering Index Backfile | 1904
|