It is shown how lift-slab method was used to temporarily hoist building out of way so 2-level basement could be built under it; jacks mounted on pile tops 14 ft above ground raised 600-ton laboratory which was held by 14 needle beams passed beneath structure.
It is shown how lift-slab method was used to temporarily hoist building out of way so 2-level basement could be built under it; jacks mounted on pile tops 14 ft above ground raised 600-ton laboratory which was held by 14 needle beams passed beneath structure.
Lab gets two new floors -- Underneath it
Construction Methods Equipment
Smith, G.R. (Autor:in)
1964
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
CONCRETE FLOORS AND SCREEDS - Concrete floors project gets off the ground
Online Contents | 2000
|Concrete floors project gets off the ground
British Library Online Contents | 2000
|Towering under - The Eiffel Tower gets two new floors -- underground.
Online Contents | 2002
UNDERNEATH THE COVERS - The romantic nomenclature of French upholstery gets Ros Byam Shaw misty-eyed
Online Contents | 2007
|British Library Online Contents | 1998