Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bendorf bridge -- New world record in prestressed concrete
Construction of new highway bridge over Rhine River about 5 mi north of Koblenz, West Germany; 682 ft long main span is stated to be world's longest cast-in-place, prestressed concrete box girder span; European method of cantilevering with traveling forms employed to build main and side spans of 3378-ft-long, 102-ft-wide bridge is described.
Bendorf bridge -- New world record in prestressed concrete
Construction of new highway bridge over Rhine River about 5 mi north of Koblenz, West Germany; 682 ft long main span is stated to be world's longest cast-in-place, prestressed concrete box girder span; European method of cantilevering with traveling forms employed to build main and side spans of 3378-ft-long, 102-ft-wide bridge is described.
Bendorf bridge -- New world record in prestressed concrete
Eng News -- Rec
Engineering News-Record ; 173
1964
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed concrete bridge over Rhine River at Bendorf
Engineering Index Backfile | 1966
|Prestressed concrete bridge over Rhine at Bendorf, Project 1
Engineering Index Backfile | 1965
|