Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prestressed prefabricated concrete bridge over Oosterschelde
5021-m long 10.35 m wide 50-span bridge comprises only seven basic precast element types; legs of pier shaped like inverted V are anchored to cement-filled concrete boxes founded on group of three foundation piles assembled in required lengths (25 to 50 m) from 4.25-m diam 5. 9-m long precast tubes; arches consist of T-shaped abutments anchored to pier heads, and three other elements; fabrication and assembly methods are described.
Prestressed prefabricated concrete bridge over Oosterschelde
5021-m long 10.35 m wide 50-span bridge comprises only seven basic precast element types; legs of pier shaped like inverted V are anchored to cement-filled concrete boxes founded on group of three foundation piles assembled in required lengths (25 to 50 m) from 4.25-m diam 5. 9-m long precast tubes; arches consist of T-shaped abutments anchored to pier heads, and three other elements; fabrication and assembly methods are described.
Prestressed prefabricated concrete bridge over Oosterschelde
Spannbetonbruecke aus vorgefertigten Teilen ueber die Oosterschelde
Menkhoff, H. (Autor:in)
Bauingenieur ; 40
1965
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 1988
|