Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Plinth piling -- New method of laying foundations
Method of driving is carried out on several construction projects in Central Sweden; bush tube with external diameter of 34 cm is forced down through loose upper layer of earth; pile shoe is pushed in front of tube as it is pounded down; driving is done with 3 ton pile-driver which is hollow; upper end has form of receiving pocket for concrete and bottom is drawn out in form of tube which fits into bush tube. English summary.
Plinth piling -- New method of laying foundations
Method of driving is carried out on several construction projects in Central Sweden; bush tube with external diameter of 34 cm is forced down through loose upper layer of earth; pile shoe is pushed in front of tube as it is pounded down; driving is done with 3 ton pile-driver which is hollow; upper end has form of receiving pocket for concrete and bottom is drawn out in form of tube which fits into bush tube. English summary.
Plinth piling -- New method of laying foundations
Plintpalning-en ny grundlaggningsmetod
Bjerking, S.E. (Autor:in)
1963
3 pages
Aufsatz (Zeitschrift)
Schwedisch
© Metadata Copyright Elsevier B. V. All rights reserved.
PREFABRICATED PLINTH, BASE RADIO STATION COMPRISING SUCH PLINTH AND METHOD FOR ASSEMBLING A PLINTH
Europäisches Patentamt | 2024
|PREFABRICATED PLINTH, BASE RADIO STATION COMPRISING SUCH PLINTH AND METHOD FOR ASSEMBLING A PLINTH
Europäisches Patentamt | 2024
|