Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of route 109, section 5-B, of Independent System of City-owned Rapid Transit Railroads, New York City; it is first circular shield-driven concrete-block lined tunnel to be constructed for rapid-transit purposes; equipment and methods of tunneling; details of concrete blocks; underpinning of buildings. (See also - discussion p 141-147)
Construction of route 109, section 5-B, of Independent System of City-owned Rapid Transit Railroads, New York City; it is first circular shield-driven concrete-block lined tunnel to be constructed for rapid-transit purposes; equipment and methods of tunneling; details of concrete blocks; underpinning of buildings. (See also - discussion p 141-147)
Pre-cast concrete-block subway tunnel
Mun. Engrs. Jl
Stewart, W.H. (Autor:in)
1930
35 pages
20 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Precast Concrete Tunnel Linings for Toronto Subway
ASCE | 2021
|Methodology for Inspection of Reinforced Concrete Subway Tunnel
British Library Conference Proceedings | 2007
|Pre-cast 135-ton concrete slabs on C.N.R. subway
Engineering Index Backfile | 1940
|Parameter identification of concrete lining for a subway tunnel
Online Contents | 2004
Parameter identification of concrete lining for a subway tunnel
British Library Conference Proceedings | 2004
|