Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Time studies of highway contract operations
Results of studies by Division of Management of U. S. Bureau of Public Roads of highway production problems and methods of eliminating avoidable delays; cost of delays; method of handling bulk cement; average hauling cycle; shovel studies; improving blasting operations; effect of changes on production. Before Highway Conference at University Colorado.
Time studies of highway contract operations
Results of studies by Division of Management of U. S. Bureau of Public Roads of highway production problems and methods of eliminating avoidable delays; cost of delays; method of handling bulk cement; average hauling cycle; shovel studies; improving blasting operations; effect of changes on production. Before Highway Conference at University Colorado.
Time studies of highway contract operations
Roads Streets
Rogers, C.F. (Autor:in)
Roads and Streets ; 70
1930
6 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Determining Minimum Contract Time for Highway Projects
British Library Online Contents | 2000
|Highway Maintenance by Contract
British Library Conference Proceedings | 1999
|Contract highway maintenance economical
Engineering Index Backfile | 1927
|Automated contract time determination system for highway projects
British Library Online Contents | 2009
|