Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of alpine highway in Austria
Construction work began early in September, to be completed in 3 years; estimated cost $1,750,000; highway to connect Ferleiten in Province of Salzburg with Heiligblut in Province of Carinthia.
Construction of alpine highway in Austria
Construction work began early in September, to be completed in 3 years; estimated cost $1,750,000; highway to connect Ferleiten in Province of Salzburg with Heiligblut in Province of Carinthia.
Construction of alpine highway in Austria
Commerce Reports
Richardson, G. (Autor:in)
1930
2 pages
1 Fig.
Report
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and construction of Alpine highway
Engineering Index Backfile | 1938
|Design and construction of Alpine highway
Engineering Index Backfile | 1938
|Progress report on construction of Grossglockner Alpine highway
Engineering Index Backfile | 1934
|Progress of highway research in Austria
Engineering Index Backfile | 1927
|Avalanche scenarios for alpine highway bridges
British Library Conference Proceedings | 2000
|