Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundations for the Cleveland union terminal
Report on laboratory and field tests of materials underlying foundation site of 52-story tower of Cleveland Union Terminal; footings had to be extended 204 ft. below rail level; excavation caused subsidence; construction of 3400-ft. viaduct across Cuyahoga Valley, to accommodate four tracks at one end and five at other; hardwood piles used; bridging canal road; logs of test holes.
Foundations for the Cleveland union terminal
Report on laboratory and field tests of materials underlying foundation site of 52-story tower of Cleveland Union Terminal; footings had to be extended 204 ft. below rail level; excavation caused subsidence; construction of 3400-ft. viaduct across Cuyahoga Valley, to accommodate four tracks at one end and five at other; hardwood piles used; bridging canal road; logs of test holes.
Foundations for the Cleveland union terminal
Civil Eng
Marsh, C.P. (Autor:in)
1930
6 pages
10 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Deepest open-pit foundations for Cleveland union terminal
Engineering Index Backfile | 1928
|Cleveland railroads dedicate union terminal
Engineering Index Backfile | 1930
|Construction of the Cleveland union passenger terminal
Engineering Index Backfile | 1926
|Some foundations for buildings in Cleveland
Engineering Index Backfile | 1906
|Rapid-transit lines' subway into Cleveland union terminal built under busy street
Engineering Index Backfile | 1931
|