Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wellington-Tawa flat deviation
Construction of deviation of portion of Wellington-Manawatu Railway, reducing distance from Wellington to Tawa Flat by about 2 mi. 42 chains, and summit level by 323 ft.; total length of new work is little over 7 mi., of which 3 mi. 34 chains is tunnelling; concrete lined horseshoe tunnel is 25 ft. 9 1/2 in. wide, 20 ft. high.
Wellington-Tawa flat deviation
Construction of deviation of portion of Wellington-Manawatu Railway, reducing distance from Wellington to Tawa Flat by about 2 mi. 42 chains, and summit level by 323 ft.; total length of new work is little over 7 mi., of which 3 mi. 34 chains is tunnelling; concrete lined horseshoe tunnel is 25 ft. 9 1/2 in. wide, 20 ft. high.
Wellington-Tawa flat deviation
New Zealand Soc. Civil Engrs. -- Proc
Newnham, W.L. (Autor:in) / Downer, A.F. (Autor:in)
1930
41 pages
18 Figs. Partly on supp. plates
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
Rancang Bangun Aplikasi Gamelan Jegog (Barangan, Kancil, Dan Tawa-Tawa) Multitouch Berbasis Android
DOAJ | 2016
|Sedimentation Study of Tawa Dam Reservoir
Springer Verlag | 2021
|Tawa Bahanne, Messenger of the Sun. Final Report
NTIS | 1984
British Library Online Contents | 2017