Tyne commission quay, north shields
Construction of quay, 11,000 ft. long, also of passenger station situated 2 mi. from mouth of Tyne River; description of shed 500 ft. long by 60 ft. wide, hydraulic coal hoist, two electric traveling portal cranes of 5 and 3 tons capacity, and seven 1 1/2-ton hydraulic capstans, steel sheet piling and anchor blocks; dredging and sinking of cylinders; electric substation and hydraulic power house. (See also Instn. Civil Engrs. -- Minutes of Proc., vol. 22, no. 4719, 1930, 17 pp., 7 figs. on supp. plate; abstract in Civil Eng., vol. 24, no. 8, Jan. 1930, p. 391)
Tyne commission quay, north shields
Construction of quay, 11,000 ft. long, also of passenger station situated 2 mi. from mouth of Tyne River; description of shed 500 ft. long by 60 ft. wide, hydraulic coal hoist, two electric traveling portal cranes of 5 and 3 tons capacity, and seven 1 1/2-ton hydraulic capstans, steel sheet piling and anchor blocks; dredging and sinking of cylinders; electric substation and hydraulic power house. (See also Instn. Civil Engrs. -- Minutes of Proc., vol. 22, no. 4719, 1930, 17 pp., 7 figs. on supp. plate; abstract in Civil Eng., vol. 24, no. 8, Jan. 1930, p. 391)
Tyne commission quay, north shields
Engineering
Hindmarsh, R.F. (Autor:in)
Engineering ; 129
1930
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Tyne commission quay, north shields
Engineering Index Backfile | 1930
|Tyne commission quay, North Shields
Engineering Index Backfile | 1931
|Tyne commission quay, north shields
Engineering Index Backfile | 1930
|New quay at Willington-on-Tyne
Engineering Index Backfile | 1941
Quay extension works at Newcastle-upon-Tyne
Engineering Index Backfile | 1913
|