Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dredges alternate with various hauling outfits in building levee
Numerous delays and high water cause unusual conditions in building 7900 ft. of new B-section cut-off levee at Alsatia, La.; layout of dredging operations in levee construction; retaining walls and dikes, 4 ft. high, were thrown up by draglines taking material from inside of area to be filled.
Dredges alternate with various hauling outfits in building levee
Numerous delays and high water cause unusual conditions in building 7900 ft. of new B-section cut-off levee at Alsatia, La.; layout of dredging operations in levee construction; retaining walls and dikes, 4 ft. high, were thrown up by draglines taking material from inside of area to be filled.
Dredges alternate with various hauling outfits in building levee
Contractors Engrs. Monthly
1929
2 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1902
|Levee building with hydraulic dredges on the Mississippi
Engineering Index Backfile | 1930
|Large clam-shell dredges; levee building methods and standards in California
Engineering Index Backfile | 1913
|Engineering Index Backfile | 1912
|Engineering Index Backfile | 1900
|