Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction. Reinforced concrete jetty and terminals at Cherbourg
Dec. 1929 no. 12 pp. 137-146: Reconstruction of existing jetty to form quay 2000 ft. in length and capable of berthing largest steamers at low tide; erection of new harbor terminus; details of drydock construction; driving steel piling. Jan. 1929 no. 1 pp. 53-56: 190-hp. power station; compressed-air distribution. Feb. 1929 no. 2 pp. 137-146, 24 figs.: Caisson formwork and concreting of caissons; towing and sinking of caissons; chuting mass concrete; analysis of air consumption.
Construction. Reinforced concrete jetty and terminals at Cherbourg
Dec. 1929 no. 12 pp. 137-146: Reconstruction of existing jetty to form quay 2000 ft. in length and capable of berthing largest steamers at low tide; erection of new harbor terminus; details of drydock construction; driving steel piling. Jan. 1929 no. 1 pp. 53-56: 190-hp. power station; compressed-air distribution. Feb. 1929 no. 2 pp. 137-146, 24 figs.: Caisson formwork and concreting of caissons; towing and sinking of caissons; chuting mass concrete; analysis of air consumption.
Construction. Reinforced concrete jetty and terminals at Cherbourg
Concrete Constr. Eng
1930
24 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1948
|Reinforced concrete jetty at North-Fleet
Engineering Index Backfile | 1929
Gunite repairs to reinforced concrete jetty
Engineering Index Backfile | 1948
Reinforced concrete jetty at Briton ferry
Engineering Index Backfile | 1947
Reinforced concrete jetty on the thames
Engineering Index Backfile | 1928