Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Description of works recently carried out by Southern Railway Company at Southampton in West bay of river; test dredging and reclamation; quaywall; King George V graving dock; culverts and pumping station equipment; condensing water culverts and storm-water drainage. (See also - discussion n 8 220-36; (discussion) Oct p 553-68; Dock and Harbour Authority v 17 n 213, 214 and 215 July 1938 p 256-61, Aug p 290-3 and Sept p 320-3)
Description of works recently carried out by Southern Railway Company at Southampton in West bay of river; test dredging and reclamation; quaywall; King George V graving dock; culverts and pumping station equipment; condensing water culverts and storm-water drainage. (See also - discussion n 8 220-36; (discussion) Oct p 553-68; Dock and Harbour Authority v 17 n 213, 214 and 215 July 1938 p 256-61, Aug p 290-3 and Sept p 320-3)
Southampton docks extension
Instn Civ Engrs -- J
McHaffie, M.G.J. (Autor:in)
1938
36 pages
Supp plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|Southampton docks extension works
Engineering Index Backfile | 1929
Southampton docks improvement works
Engineering Index Backfile | 1940
|