Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reconstruction of mocoreta and timboy bridges, argentine north-eastern railway
Construction of two 3-span plate girder railroad bridges, spans varying from 20 to 22 m in length; details of pile foundations; cost data. (See also - n 8 Oct discussion p 528-30)
Reconstruction of mocoreta and timboy bridges, argentine north-eastern railway
Construction of two 3-span plate girder railroad bridges, spans varying from 20 to 22 m in length; details of pile foundations; cost data. (See also - n 8 Oct discussion p 528-30)
Reconstruction of mocoreta and timboy bridges, argentine north-eastern railway
Instn Civ Engrs -- J
Blofield, G.C. (Autor:in)
1938
18 pages
Supp plates
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of mocoreta and timboy bridges, argentine north-eastern railway
Engineering Index Backfile | 1938
|Reconstruction of French railway bridges
Engineering Index Backfile | 1948
|Reconstruction of two railway bridges
Engineering Index Backfile | 1949
Reconstruction of French railway bridges
Engineering Index Backfile | 1946
The eastern Oklahoma railway line and bridges
Engineering Index Backfile | 1904
|