Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pre-cast reinforced-concrete underline railway bridge
Construction of new bridge consisting of two spans 41 ft 9 in. and 9 ft 6 in., carrying Piccadilly line of London Passenger Transport Board over ticket hall of South Harrow station; bridge was constructed complete in temporary position adjacent to tracks, and during Sunday possession of line it was rolled into position. (See also - n 8 Oct 1938 discussion p 377)
Pre-cast reinforced-concrete underline railway bridge
Construction of new bridge consisting of two spans 41 ft 9 in. and 9 ft 6 in., carrying Piccadilly line of London Passenger Transport Board over ticket hall of South Harrow station; bridge was constructed complete in temporary position adjacent to tracks, and during Sunday possession of line it was rolled into position. (See also - n 8 Oct 1938 discussion p 377)
Pre-cast reinforced-concrete underline railway bridge
Instn Civ Engrs -- J
Follenfant, H.G. (Autor:in)
1937
10 pages
Supp plates
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Pre-cast reinforced-concrete underline railway bridge
Engineering Index Backfile | 1937
|Underline railway bridge in Canada
Engineering Index Backfile | 1942
Underline railway bridges in Canada
Engineering Index Backfile | 1934
|Strengthening a cast-iron railway bridge with reinforced concrete
Engineering Index Backfile | 1925
|