Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Speeding housing projects by flow-production
Pair of 3-bedroom, semi-detached permanent houses built in under 3 weeks at Stratford-upon-Avon, England, features movable internal partition walls, internal plumbing system and use of plastic rainwater fittings; only part to be made on site is 14 ton 7-in. thick concrete casting party wall and waterproof concrete floor; 6 factory-made components comprise first floor of each house and when these, and staircase unit, have been craned into position, slightly pitched roof units, each of marine 3-ply in-stressed triangular box formation, are dropped into place.
Speeding housing projects by flow-production
Pair of 3-bedroom, semi-detached permanent houses built in under 3 weeks at Stratford-upon-Avon, England, features movable internal partition walls, internal plumbing system and use of plastic rainwater fittings; only part to be made on site is 14 ton 7-in. thick concrete casting party wall and waterproof concrete floor; 6 factory-made components comprise first floor of each house and when these, and staircase unit, have been craned into position, slightly pitched roof units, each of marine 3-ply in-stressed triangular box formation, are dropped into place.
Speeding housing projects by flow-production
Surveyor
Surveyor ; 122
1963
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2007
|Trans Tech Publications | 2013
|Rational method of speeding up steel production
Engineering Index Backfile | 1963
|Rational method of speeding up steel production
Engineering Index Backfile | 1963
|Maccreanor Lavington housing projects
British Library Online Contents | 1999