Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway will form first link of future 19 km long system; its total width of 25 m consists of 3.0 m wide sidewalk, 6.5 m wide roadway, 6. 0 m wide streetcar track, 6.5 m wide roadway, and 3.0 m wide sidewalk; total length 700 m; construction will take about 18 mo and began in Spring of 1963.
Highway will form first link of future 19 km long system; its total width of 25 m consists of 3.0 m wide sidewalk, 6.5 m wide roadway, 6. 0 m wide streetcar track, 6.5 m wide roadway, and 3.0 m wide sidewalk; total length 700 m; construction will take about 18 mo and began in Spring of 1963.
Koenig-Wilhelm-Strasse urban elevated highway in Gelsenkirchen
Hochstrasse der Koenig-Wilhelm-Strasse Gelsenkirchen
Samel, K. (Autor:in)
Bauingenieur ; 38
1963
6 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Overhead roadway of Koenig-Wilhelm street in Gelsenkirchen
Engineering Index Backfile | 1965
|UB Braunschweig | 1998
|TIBKAT | 1998
|UB Braunschweig | 1999
|