Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Straight drop spillway stilling basin
Experimental design procedures were used to develop generalized stilling basin for straight drop spillway; water falling over spillway crest falls onto flat apron; nappe is broken up by floor blocks, which also prevent damaging scour of downstream channel banks; scour of downstream channel bed is prevented by end sill; flaring wingwalls, triangular in elevation, prevent erosion of dam fill; for proper operation of stilling basin, contraction of flow at ends of spillway opening must be partly suppressed.
Straight drop spillway stilling basin
Experimental design procedures were used to develop generalized stilling basin for straight drop spillway; water falling over spillway crest falls onto flat apron; nappe is broken up by floor blocks, which also prevent damaging scour of downstream channel banks; scour of downstream channel bed is prevented by end sill; flaring wingwalls, triangular in elevation, prevent erosion of dam fill; for proper operation of stilling basin, contraction of flow at ends of spillway opening must be partly suppressed.
Straight drop spillway stilling basin
ASCE -- Proc (J Hydraulics Div)
Donnelly, C.A. (Autor:in) / Blaisdaell, F.W. (Autor:in)
1965
31 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Straight Drop Spillway Stilling Basin
ASCE | 2021
|Straight drop spillway stilling basin
TIBKAT | 1954
|Discussion of “Straight Drop Spillway Stilling Basin”
ASCE | 2021
|Closure to “Straight Drop Spillway Stilling Basin”
ASCE | 2021
|Folsom Dam Spillway Stilling Basin Repair
British Library Conference Proceedings | 1998
|