Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Third rhine bridge in British zone of Germany
Temporarily reconstructed bridge at Duesseldorf has been opened; two 345 ft Schaper-Krupp-Reichsbahn standard temporary spans were used; bridge is double line structure having four main spans about 360 ft in length; length oa 2600 ft; main spans were steel arches which had been in service 33 yr; brief note on construction work. (editorial comment 430)
Third rhine bridge in British zone of Germany
Temporarily reconstructed bridge at Duesseldorf has been opened; two 345 ft Schaper-Krupp-Reichsbahn standard temporary spans were used; bridge is double line structure having four main spans about 360 ft in length; length oa 2600 ft; main spans were steel arches which had been in service 33 yr; brief note on construction work. (editorial comment 430)
Third rhine bridge in British zone of Germany
Ry Gaz
Railway Gazette ; 85
1946
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rhine railway bridges in British Zone
Engineering Index Backfile | 1946
Reconstruction of bombed bridge over Rhine river at Wesel, Germany
Engineering Index Backfile | 1954
|New highway bridge over Rhine River at Cologne-Deutz, Germany
Engineering Index Backfile | 1950
New highway bridge over Rhine River at Cologne-Deutz, Germany
Engineering Index Backfile | 1949
|Engineering Index Backfile | 1945